Operator-Hot End

نظرة عامة على الوظيفة

  • تاريخ الإعلان
    نوفمبر 15, 2025
  • الموقع
  • تاريخ إنتهاء الصلاحية
    --

المسمى الوظيفي

411_2405381

المسؤوليات

  • Monitor, maintain, and control Furnace process parameters from batch hopper, batch charger, doghouse, melter, refiner, and up to canal.
  • Accomplish Furnace Inspection Check sheet and promptly report details in case of deviation.
  • Inspect regenerators, Furnace sidewalls & bottom, combustion blowers, melting of batch piles, batch chargers, Furnace control system, reversals, refractory gates position and its condition, burner firing and flame condition, gas leakages, glass level.
  • Conduct visual inspection and check sheet recording in and around the Float Bath and Lehr.
  • Perform and attend to required adjustments as instructed by superior.
  • Responsible in keeping set target parameters in bath, lehr and coating.
  • Report feedback to superior on any deviation in process or installation safety.
  • Measuring Annealing lehr temperatures manually to cross check online indicators.
  • Monitoring glass surface quality and perform preventive and corrective measures to minimize appearance of defects.
  • Maintain record of measured parameters and report same for analysis & improvements.
  • Organizing tools for special jobs and execution of Tin bath, Lehr and Coating maintenance and operational activities.
  • Transfer, load and prepare slurry batch for Coating operations.

Knowledge, Training and Experience Required for Job

التعليم:
الخبرة:

Minimum 3 years in any process industry preferably from Float Glass manufacturing.

Language Skills:

Written and verbal communication in English.

Working Conditions:

Work requires good technical and coordination skills as well as mechanically inclined ability. Requires good observation skills and initiative.

#J-18808-Ljbffr

2025-11-11 13:05:53