Replacement of Cloth Shades in Car Parking & Kids Play Area
نظرة عامة على الوظيفة
-
تاريخ الإعلاننوفمبر 15, 2025
-
الموقع
-
تاريخ إنتهاء الصلاحية--
المسمى الوظيفي
411_2672979
Replacement of Cloth Shades in Car Parking & Kids Play Area
Services Posted On: October 5, 2025 Closing On: October 12, 2025
Replacement of Cloth Shades in Car Parking & Kids Play Area
Site Survey & Assessment
- Carry out site inspection to verify existing structural supports, connections, and dimensions.
- Confirm that the existing frames and foundations are structurally sound and suitable for reinstallation of new shade cloths.
Removal of Existing Shade Cloths
- Carefully remove the old and dirty shade cloths without damaging the steel/aluminium support structures.
- Collect and dispose of the old material as per Dubai Municipality waste management regulations .
Supply of New Shade Cloths
- Provide high-quality fabric (HDPE or PVC-coated polyester) with the following minimum specifications:
- UV protection : ≥ 95% to protect vehicles and children from harmful sun rays.
- Fire retardant : Certified and approved by Dubai Civil Defence (DCD) .
- Heat and weather resistance : Withstand extreme Dubai climate.
- Dust resistant and easy to clean .
- Warranty : Minimum 5–10 years for the fabric.
- Fabric to be certified by Dubai Central Laboratory (DCL) or equivalent.
Installation of New Shade Cloths
- Stitch and reinforce the cloth edges with double/triple seam for extra strength.
- Install shade cloths using stainless steel eyelets, tensioning wires, and fixing accessories for durability.
- Ensure cloths are stretched properly with no sagging or loose edges.
- Provide child-safe finishing in the play area (no sharp edges or exposed fittings).
Quality, Safety & Compliance
- All works to comply with:
- Dubai Municipality regulations for structural safety.
- Dubai Civil Defence (DCD) requirements for fire-retardant materials.
- Health & Safety guidelines for child play areas.
- Use of personal protective equipment (PPE) and safe working practices during installation.
- Conduct site safety checks before and after work completion.
Final Cleaning & Handover
- Clean the site after completion of installation.
- Submit product data sheets, compliance certificates, and warranty documents .
- Perform joint inspection with client before handover.
Building Location: Royal Oceanic, Dubai Marina, Dubai, United Arab Emirates
Site Engineer: SIMIN –
#J-18808-Ljbffr
2025-11-11 12:44:17